Bridges Reconstruction Programme (BRP)

Over a 5-year period and with aggressive consultation, the Bridges Reconstruction Programme will include a multi-phase approach  to the construction and improvement of 24 bridges. Now in the procurement stages, NIDCO continues to enforce the primary objective of transparency by only allowing a maximum of 2 contract awards to any given C3 classified contractor and a maximum of 1 contract award to any given C1 classified contractor. Below is a detailed breakdown of the various bridge packages:

Package No.

Bridge I.D No.

Bridge Location

Type of Structure

 
 

 

 

BBFL CARIBEAN LTD (PACKAGE A)

 

 

1

B1/1

Coblentz, St. Ann, POS

Bridge

 

B1/1

Orange Grove, Tunapuna

Culvert

 

2

B1/12

EMR, St. Joseph

Bridge

 

3

B1/9

Talparo Main Road

Culvert

 

B2/1

Valencia Road

Bridge

 

4

B1/19W

EMR Guanapo

Bridge

 

5

B2/10

Toco Road

Culvert

 

6

B1/19

Toco Road

Culvert

 

8

B1/22

Toco Road Breakfast River

Culvert

 

7

C1/32

Toco Road

Culvert

 

20

B1/12

Paria Main Road, Blanchissuese

Culvert

 

21

B1/10

Talparo Main Road

Culvert

 

22

B1/3

Four Roads Tamana

Culvert

 

23

B1/1

Cumuto Tumpuna Road

Culvert

 

 

 

TRINTOPLAN CONSULTANTS (PACKAGE B)

 

 

9

B1/1

Camden Road

Bridge

 

10

B1/1

Ring Road St. Madeline

Bridge

 

11

C2/3

Papourie Road, Debe

Bridge

 

B1/2

Rivulet Road, Pt. Lisas

Culvert

 

12

B1/3

Cedar Hill Road

Bridge

 

13

B1/3

Sisters Road

Bridge

 

14

B1/3

Torrib Tabaquite Road

Bridge

 

15

B3/5

Pluck Road (Sum Sum Hill)

Bridge

 

18

B1/73

SMR, Cedros

Bridge

 

17

B1/13

Mayaro Guayaguayare

Bridge

 

16

B1/22

Naparima Mayaro Road

Bridge

 

19

B1/23

Calcutta Road # 2

Bridge

 