Bridges Reconstruction Programme (BRP)
Over a 5-year period and with aggressive consultation, the Bridges Reconstruction Programme will include a multi-phase approach to the construction and improvement of 24 bridges. Now in the procurement stages, NIDCO continues to enforce the primary objective of transparency by only allowing a maximum of 2 contract awards to any given C3 classified contractor and a maximum of 1 contract award to any given C1 classified contractor. Below is a detailed breakdown of the various bridge packages:
Package No. |
Bridge I.D No. |
Bridge Location |
Type of Structure |
|
|
|
BBFL CARIBEAN LTD (PACKAGE A) |
|
|
1 |
B1/1 |
Coblentz, St. Ann, POS |
Bridge |
|
B1/1 |
Orange Grove, Tunapuna |
Culvert |
||
2 |
B1/12 |
EMR, St. Joseph |
Bridge |
|
3 |
B1/9 |
Talparo Main Road |
Culvert |
|
B2/1 |
Valencia Road |
Bridge |
||
4 |
B1/19W |
EMR Guanapo |
Bridge |
|
5 |
B2/10 |
Toco Road |
Culvert |
|
6 |
B1/19 |
Toco Road |
Culvert |
|
8 |
B1/22 |
Toco Road Breakfast River |
Culvert |
|
7 |
C1/32 |
Toco Road |
Culvert |
|
20 |
B1/12 |
Paria Main Road, Blanchissuese |
Culvert |
|
21 |
B1/10 |
Talparo Main Road |
Culvert |
|
22 |
B1/3 |
Four Roads Tamana |
Culvert |
|
23 |
B1/1 |
Cumuto Tumpuna Road |
Culvert |
|
|
|
TRINTOPLAN CONSULTANTS (PACKAGE B) |
|
|
9 |
B1/1 |
Camden Road |
Bridge |
|
10 |
B1/1 |
Ring Road St. Madeline |
Bridge |
|
11 |
C2/3 |
Papourie Road, Debe |
Bridge |
|
B1/2 |
Rivulet Road, Pt. Lisas |
Culvert |
||
12 |
B1/3 |
Cedar Hill Road |
Bridge |
|
13 |
B1/3 |
Sisters Road |
Bridge |
|
14 |
B1/3 |
Torrib Tabaquite Road |
Bridge |
|
15 |
B3/5 |
Pluck Road (Sum Sum Hill) |
Bridge |
|
18 |
B1/73 |
SMR, Cedros |
Bridge |
|
17 |
B1/13 |
Mayaro Guayaguayare |
Bridge |
|
16 |
B1/22 |
Naparima Mayaro Road |
Bridge |
|
19 |
B1/23 |
Calcutta Road # 2 |
Bridge |