NIDCO in the News

Churchill Roosevelt Highway Extension to Manzanilla

 

CRHEM-01

Phase 1 – the Cumuto Junction to the Toco Main Road

This Project involves the construction of a new section of the Churchill Roosevelt Highway (CRH) from the Cumuto Jumction to the Toco Main Road. The length of the Highway to be constructed is approximately 14 km.

The proposed route commences at the proposed Cumuto Interchange #2 about 8km southeast of the CRH. It is proposed that the Highway will proceed East of Wallerfield, South of the Aripo Savannah, North of the Town of Sangre Grande and subsequently proceed in a South Easterly direction to end just beyond the Toco Main Road.

 

Follow Us Online